| Name |
General Mission |
Launch Vehicle (Site) |
Performance Veh |
Performance Payload |
Performance Mission Results |
| November 16, 1962 |
| Saturn (SA-3) |
Launch vehicle development test ("Project Highwater") |
Saturn C-1 (AMR) |
S |
S |
S |
| December 16 |
| Explorer XVI (S-55b) |
Scientific micrometeoroid satellite |
Scout (WS) |
S |
S |
S |
| March 28, 1963 |
| Saturn (SA-4) |
Launch vehicle development test ("engine out" capability test) |
Saturn C-1 (AMR) |
S |
S |
S |
| April 2 |
| Lunik IV |
Lunar probe-reported attempt to soft-land instrument package |
Unknown (U.S.S.R) |
Unknown |
Unknown |
Unknown |
| April 2 |
| Explorer XVII |
Measure atmospheric density, composition, pressure, and temperature at altitudes of 249 to 933 kilometers (155 to 580 miles) |
Thor-Delta (AMR) |
S |
S |
S |
| May 15 |
| Faith 7 (MA-9) |
Project Mercury manned one-day mission-fourth US manned orbital flight |
Atlas (AMR) |
S |
S |
S |
| June 14 |
| Vostok V |
Manned orbital space flight. First launch of second tandem flight |
Unknown (U.S.S.R.) |
S |
S |
S |
| June 16 |
| Vostok VI |
Manned orbital space flight. Second launch of second tandem flight |
Unknown (U.S.S.R.) |
S |
S |
S |
| July 20 |
| |
Experimental heatshield reentry (29,934 kilometers per hour) (18,600mph) test |
Scout (WS) |
F |
F |
F |
| August 28 |
| |
Prove capability of Little Joe II as an Apollo spacecraft test vehicle |
Little Joe II (WSMR) |
S |
S |
S |
| November 7 |
| Pad Abort-1 |
Qualification test of Apollo launch escape system to effect a safe pad abort. (Spacecraft BP-6) |
(WSMR) |
- |
S |
S |
| November 26 |
| Explorer XVIII |
To measure interplanetary magnetic fields, solar wind, and cosmic radiation between earth and moon |
Thor-Delta (AMR) |
S |
S |
S |
| November 27 |
| Centaur II |
In-space ignition of Centaur's liquid-hydrogen engines (second attempt, first success) |
Atlas-centaur (AMR) |
S |
S |
S |
| December 19 |
| Explorer XIX |
To measure atmospheric density fluctuations of earth's high latitudes |
Scout (PMR) |
S |
S |
S |
| January 29, 1964 |
| Saturn (SA-5) |
Test structure and performance of 2-stage Saturn; orbit second stage |
Saturn I (AMR) |
S |
S |
S |
| January 30 |
| Ranger VI |
Television photographs of moon at close range |
Atlas-Agena B (AMR) |
S |
F |
F |
| April 8 |
| Gemini-Titan 1 |
Unmanned flight test of structural integrity of Gemini spacecraft and compatibility with launch vehicle |
Titan II (AMR) |
S |
S |
S |
| April 14 |
| Project Fire |
Test of Apollo sample heatshield material at lunar reentry speeds |
Atlas D (AMR) |
S |
S |
S |
| May 13 |
| Apollo Mission A-001 |
Test capability of launch escape system to propel spacecraft from launch vehicle during abort at transonic speed (Spacecraft BP-12) |
Little Joe II (WSMR) |
S |
S |
S |
| May 28 |
| Apollo Mission A-101 (SA-6) |
First flgiht of an Apollo-configured spacecraft with a Saturn launch vehicle (Spacecraft BP-13) |
Saturn I (AMR) |
S |
S |
S |
| July 28 |
| Ranger VII |
Television photographs of the moon at close range |
Atlas-Agena B (AMR) |
S |
S |
S |
| August 18 |
| |
Experimental heatshield reentry test |
Scout (WS) |
S |
S |
S |
| August 25 |
| Explorer XX |
Map irregularities in topside of earth's atmosphere; obtain electron densities and temperatures near satellite |
Scout (PMR) |
S |
S |
S |
| September 18 |
| Apollo Mission A-102 (SA-7) |
Demonstrate spacecraft-launch vehicle compatibility (Spacecraft BP-15) |
Saturn I (AMR) |
S |
S |
S |